Completed projects

Below is a list of our most prominent and recent projects.

Dates Customers Project details
2017-2018 Stockholm, Arlanda Airport, BeumerGroup (Swedavia) Installation of baggage handling and storage system at Arlanda Airport T5, Stockholm 
2018-2022 Shirebrook, UK
Dematic, Fortna
(​Sports Direct)
AutoStore grids
Phase 1 - 70 000 bins (2018)
Phase 6 - 70 000 bins (2020)
Phase 7 - 250 460 bins (2021)
Phase 8 - 247632 bins (2022)
2019
London Heathrow, UK
Dematic
Modification of existing AutoStore grid
Building mezzanine with 1000 extra bins
2019 Billund Airport, Denmark, BeumerGroup Installation of new baggage handling system
2020 Waalwijk, NL, BeumerGroup (PostNL/Bol.com) Installation of double level belt parcel sorter at largest order fulfillment centre in the Netherlands
2021 Wissington, UK, Mecalux (British Sugar) Modification and installation of a new pallet conveyor system (1t pallets)
2022 Camarillo, CA, USA
Bastian Solutions
(Blender Agency)
AutoStore grid with 40 000 bins
2022 Sandefjord, Norway
AutoStore
AutoStore grid with 15 000 bins
2022 Golborne, UK, Mecalux (ALPLA) Installation of new pallet conveyor system with pallet elevators
2022 Olso, Norway
AutoStore
(Blender Agency)
AutoStore Pio, 7 000 bins
2022 Harstad, Norway
AutoStore
(Vakre Vene)
AutoStore Pio, 2245 bins
2023 Birmingham, UK
Dematic
(Direct Corporate Clothing)
AutoStore grid on top of platform, 135 000 bins
2023 Birmingham, UK
Kardex
(Arvato)
AutoStore grid with variable depth, 200 000 bins and complete electrical installation
2023 Lyon, France
Swisslog
AutoStore grid 40 000 bins
2024 Helsinki, Finland
Swisslog
AutoStore grid 40 000 bins